DISCIPLES OF CLAUDE
Watchlist · thesis ledger
←Back to the drivers
Name detail

CEG

+2.3% called side since lock · last close 285.07 (Oct 8) · high close 300.40 · low close 254.02 · 57 days since lock

Everything the four surfaces know about one instrument, on one page.

Locked lineages
MERGED · Ethan · settled 2028-01-31
Nuclear baseload, cleanest firm power. Arbiter lands Wednesday Aug 6 - two weeks after the room's own research report. Charlotte's capacity-factor + PPA + IRA-floor thesis gets graded, with FERC named in advance as the risk.

+4.3% called side since lock · last close 278.64 (Aug 13) · high close 278.68 · low close 261.10 · 9 days since lock · window closed Aug 13

Sealed on 2026-08-04, and since carried to its verdict — the words below are the words that were frozen; nothing was edited after the seal.
Succeeds if: The 3-2-1 crack complex does not close below $15 for 10 consecutive sessions (no crack-complex demobilization), AND the buildout does not self-fund without a scarcity premium — through the deadline.
Falsified if: crack-complex demobilization (3-2-1 crack < $15 x10 sessions) OR buildout self-funds w/o scarcity premium
Drivers Incentivized flow proposed
Verification details

Each fingerprint is a SHA-256 digest of the exact frozen text — a matching digest means the words you read are the words that were sealed.

Claim fingerprint (thesis_hash)519045b989a1688e…Falsifier fingerprint (falsifier_hash)23daa44722288f4f…Success-test fingerprint (predicate_hash)f93bf7a3c4dc0e15…Outside custodyreceipt manual_operator · digest 767ecfbb2c866538… · received
LOCKED · Ethan · Verdict due January 2028 · 479 days out
Nuclear baseload — the cleanest firm power on the grid, owned at scale. The mechanism is about the quality of a megawatt: data centers need power that is always on and increasingly need it clean, and an operating nuclear fleet is the only asset that is both, today, with a decade of construction standing between any competitor and parity. Constellation runs the largest nuclear fleet in the country, at the capacity factors that make "always on" a measured fact rather than a slogan; it has signed decade-scale contracts with the hyperscalers, and a federal floor sits under the fleet's economics — so scarcity arrives as term revenue, not spot noise. The named risk was registered in advance: FERC, the regulator with the power to move the goalposts. The expression is the common — the fleet is the position. The kill condition deliberately reaches outside the company, because the thesis is a regime claim: if the refining complex demobilizes — crack spreads collapsing and staying collapsed for ten sessions — or the buildout starts funding itself without paying any scarcity premium, then the energy-scarcity regime this name is priced on has ended, and the thesis ends with it, whatever the fleet earned that quarter. Verdict due January 31, 2028.

+2.3% called side since lock · last close 285.07 (Oct 8) · high close 300.40 · low close 254.02 · 57 days since lock

Sealed on 2026-08-13 — the claim, what would kill it, and what counts as success are frozen on an outside receipt. Nothing here can be quietly edited.
Succeeds if: The 3-2-1 crack complex does not close below $15 for 10 consecutive sessions (no crack-complex demobilization), AND the buildout does not self-fund without a scarcity premium — through the deadline.
Falsified if: crack-complex demobilization (3-2-1 crack < $15 x10 sessions) OR buildout self-funds w/o scarcity premium
Drivers Incentivized flow proposed
Verification details

Each fingerprint is a SHA-256 digest of the exact frozen text — a matching digest means the words you read are the words that were sealed.

Claim fingerprint (thesis_hash)347b3998e9f46674…Falsifier fingerprint (falsifier_hash)41397e28ed0f0e9f…Success-test fingerprint (predicate_hash)014b9266a3d2704d…Outside custodyreceipt manual_operator · digest 3a0fa76c743c577a… · received
Cross-examination

Members file counter-evidence against a locked lineage; the desk owes a public answer by a deadline that renders here either way.

No member has filed counter-evidence against this name's locked lineages. The floor is open: `/thesis challenge CEG <your counter-evidence>` from Slack.

COUNTER-EVIDENCE ≠ GRADE — a challenge never grades the thesis and never moves a score; it puts the desk on a public clock.
Edition assessments
Edition assessments

The room graded the proposition in each sealed edition — not a member.

2026-07-25 · SUPPORTED Backfilled edition hash 5ac949a40d51396556dd73a5…
2026-08-01 · SUPPORTED Backfilled edition hash 11a8fa4cad4120f7ad61f7af…
2026-08-08 · SUPPORTED Backfilled edition hash cjson-v1:29b5145ba5f2f06…
2026-08-15 · CARRY Backfilled edition hash 74627a4ca261cc14a73ccad5…
2026-08-22 · SUPPORTED Backfilled edition hash 557bf5ef55f5d1fb8c7a88bf…
2026-08-29 · SUPPORTED Backfilled edition hash 15bd0390467e559c74c076f3…
2026-09-05 · NO TEST Backfilled superseded by erratum — founder ruling D1 2026-09-20: standing thesis with no dated test grades CARRY edition hash 3ad7e3fa56cf10ecb514d9f1…
2026-09-05 · CARRY Backfilled erratum correcting an earlier row edition hash 3ad7e3fa56cf10ecb514d9f1…
2026-09-12 · CARRY Backfilled edition hash 6271a4889f18e60066663572…
2026-09-19 · CARRY Backfilled edition hash 4f554e02dd2769ad9cd297aa…
2026-10-03 · CARRY Backfilled edition hash 6cbb3f12f574ec962d2274d6…
This week · 0 events

No recorded events

Explore this week →

Coming up
Verdict deadline · Verdict due January 2028 · 479 days out

No scheduled market events on the calendar window for this name.

Arbiters
ArbitersFERC ruling (pre-named referee) · 2026-08-06 · FERC · PRE-REGISTERED (founder-approved 2026-08-04; supersedes copied-falsifier criterion). SOURCE: FERC Docket EL25-49 (Constellation Energy v. PJM, co-located load) and compliance/paper-hearing issuances stemming from the 2025-12-18 order; qualifying issuance on or about 2026-08-06. FOR (supports thesis): the ruling preserves generator-side co-location economics — no mandate of full network transmission charges on fully-isolated co-located load; behind-the-meter co-location at existing nuclear permitted on terms materially consistent with Constellation's advocacy. AGAINST: the ruling mandates full transmission/network cost allocation (or economically equivalent charges) on co-located load at existing generators, materially eroding the co-location scarcity premium. POSTPONEMENT: no qualifying issuance by 2026-08-06 +2 business days → increment postponement_count and roll arbiter_date to the docket's next scheduled issuance; no verdict-by-default. SEMANTICS: checkpoint grade FOR/AGAINST/POSTPONED per C48 product mapping — not terminal falsification. FALSIFIER NOTE: crack clause attested INTENTIONAL by founder 2026-08-04 (Thermodynamic-Wall kill-switch); 3-2-1 series pinned = (2×RBOB + 1×ULSD)/3 − WTI, NYMEX settlements; adapter procurement owed before machine evaluation. · 0/2FERC ruling (pre-named referee) · 2026-08-06 · FERC · PRE-REGISTERED (founder-approved 2026-08-04; supersedes copied-falsifier criterion). SOURCE: FERC Docket EL25-49 (Constellation Energy v. PJM, co-located load) and compliance/paper-hearing issuances stemming from the 2025-12-18 order; qualifying issuance on or about 2026-08-06. FOR (supports thesis): the ruling preserves generator-side co-location economics — no mandate of full network transmission charges on fully-isolated co-located load; behind-the-meter co-location at existing nuclear permitted on terms materially consistent with Constellation's advocacy. AGAINST: the ruling mandates full transmission/network cost allocation (or economically equivalent charges) on co-located load at existing generators, materially eroding the co-location scarcity premium. POSTPONEMENT: no qualifying issuance by 2026-08-06 +2 business days → increment postponement_count and roll arbiter_date to the docket's next scheduled issuance; no verdict-by-default. SEMANTICS: checkpoint grade FOR/AGAINST/POSTPONED per C48 product mapping — not terminal falsification. FALSIFIER NOTE: crack clause attested INTENTIONAL by founder 2026-08-04 (Thermodynamic-Wall kill-switch); 3-2-1 series pinned = (2×RBOB + 1×ULSD)/3 − WTI, NYMEX settlements; adapter procurement owed before machine evaluation. · 0/2
Fresh tape
Fresh tape
Sep 30 · Insider filing · 188 shares
Sep 30 · Insider filing · 82 shares
Sep 30 · Press release · Constellation and Amazon Announce 20-Year Power Purchase Agreement Adding 190…

Scheduled prints are context, never evidence — nothing here grades a thesis.

Tape
Tape

+12.9% since added to list · 2026-07-17 → 2026-10-08

2026-10-08 · 285.07

23/47 sessions with call — agreement, not judgment.

Newest sessions +0.6CEG · 2026-09-25
close 0.63% — with call
called side: LONG since 2026-08-13
edition week of 2026-10-03 — sealed
Tape agreement only. TAPE ≠ VERDICT.
−1.1CEG · 2026-09-28
close -1.08% — against call
called side: LONG since 2026-08-13
edition week of 2026-10-03 — sealed
Tape agreement only. TAPE ≠ VERDICT.
+1.6CEG · 2026-09-29
close 1.59% — with call
called side: LONG since 2026-08-13
edition week of 2026-10-03 — sealed
Tape agreement only. TAPE ≠ VERDICT.
−4.0CEG · 2026-09-30
close -3.99% — against call
called side: LONG since 2026-08-13
edition week of 2026-10-03 — sealed
Tape agreement only. TAPE ≠ VERDICT.
+1.9CEG · 2026-10-01
close 1.93% — with call
called side: LONG since 2026-08-13
edition week of 2026-10-03 — sealed
Tape agreement only. TAPE ≠ VERDICT.
−0.6CEG · 2026-10-02
close -0.55% — against call
called side: LONG since 2026-08-13
edition week of 2026-10-03 — sealed
Tape agreement only. TAPE ≠ VERDICT.
+3.9CEG · 2026-10-05
close 3.93% — with call
called side: LONG since 2026-08-13
Tape agreement only. TAPE ≠ VERDICT.
+12.2CEG · 2026-10-06
close 12.25% — with call
called side: LONG since 2026-08-13
Tape agreement only. TAPE ≠ VERDICT.
−0.3CEG · 2026-10-07
close -0.27% — against call
called side: LONG since 2026-08-13
Tape agreement only. TAPE ≠ VERDICT.
−4.8CEG · 2026-10-08
close -4.85% — against call
called side: LONG since 2026-08-13
Tape agreement only. TAPE ≠ VERDICT.

Daily close-to-close returns · Financial Modeling Prep end-of-day closes, automated daily ingest · newest session 2026-10-08.

TAPE ≠ VERDICT — tape agreement never grades a proposition and never derives an assessment.
Timeline lane
Timeline lane
ARBITERTODAYFERC ruling (pre-named referee) · FERC
ARBITERTODAYFERC ruling (pre-named referee) · FERC
LOCK-DEADLINET−479dmust meet its test by 2028-01-31

Full lane on the time axis

Identity
Identity
Canonical tickerCEGFirst seen edition2026-07-18Registry stateactive
2026-07-18 → open · CEG seeded from registry canonical_ticker — operator/MCP 2026-08-04 (open window; mechanical derivation, §ONTOLOGY: registry owns symbol history)
Divergence
Divergence

No divergence between the editorial and resolution layers on this name.

Open stacks

Held in 0 of 0 open member stacks.

The stacks hold the full record — stances are addresses, never advice.